Project Intelligence Centre (concept)
A current, organised reference for progress, reports, research and project communications — publishing evidence, not animation ([BB p. 23, 25]).
Headline cards — honest empty states
Renewable generation
No data — feed not commissioned—
unit: kWh · boundary: district/phase (to be defined) · period: none
Water recycled
No data — feed not commissioned—
unit: m³ · boundary: district/phase (to be defined) · period: none
Carbon avoided
No data — feed not commissioned—
unit: tCO₂e · boundary: district/phase (to be defined) · period: none
Waste diverted
No data — feed not commissioned—
unit: tonnes / % · boundary: district/phase (to be defined) · period: none
“Live” describes data freshness, not assurance ([BB p. 23]). A stale or failed feed shows a clear status and last valid period; missing data is never silently replaced with zero (D-02, [BB p. 23]).
Proposed reporting chain
Asset / meter / operator record → ingestion → validation → calculation → reviewer → approved publication → optional independent assurance. Forecast, target, measured and assured values are published in distinct labelled views ([BB p. 23]).
| Dashboard element | Specification ([BB p. 23]) |
|---|---|
| Headline cards | Energy generated/saved, water recycled, carbon avoided, waste diverted, biodiversity, green area, students, residents and jobs |
| Boundary / period | District or phase; reporting dates; operational vs construction scope; date/time of refresh |
| Method drawer | Formula, source, baseline, factor version, exclusions, uncertainty and quality status |
| Trend / comparison | Comparable periods and units; annotated scope changes; downloadable approved series |
| Exceptions | Missing data, estimated intervals, incomplete meter coverage and corrections are visible |
| Assurance / accountability | Named responsible team, review date, assurance scope/report where available |
KPI dictionary — units, boundaries & owners
| Indicator / unit | Calculation and boundary | Owner / reporting control |
|---|---|---|
| Renewable generation / kWh | Metered generation within approved asset boundary; import/export/storage treated separately | Energy lead; meter calibration and monthly reconciliation |
| Energy saving / kWh | Comparable approved baseline minus actual adjusted demand | Energy lead; weather/occupancy adjustment and baseline version |
| Water recycled / m³ | Measured reused treated water; distinguish treatment production from delivered reuse | Water operator; meter coverage and reuse-quality evidence |
| Carbon avoided / tCO₂e | Eligible activity × documented emission factor versus stated baseline | ESG lead; methodology, factor year, exclusions and uncertainty |
| Waste diverted / tonnes and % | Verified eligible diverted mass / total scoped waste generated | Waste operator; manifests and consistent denominator |
| Green area / m² or % | Approved GIS-defined landscape class / stated land boundary | Landscape lead; distinguish protected, planted, permeable and roof area |
| Trees / habitat | Surviving trees by cohort; habitat area/condition by survey method | Ecologist; survival, season and survey limitations |
| Students / residents / jobs | Defined enrolled, occupied or FTE/headcount categories at stated date | Operator/HR; aggregate only, with no personal data |
| Green finance allocation / ₹ | Eligible expenditure allocated within approved financing ledger | Finance lead; financing cap, reconciliation and no double allocation |
| Service satisfaction / % | Defined feedback sample and period; disclose response rate | Community lead; voluntary, anonymised feedback |
Data-quality vocabulary ([BB p. 24]): Target | Forecast | Measured—provisional | Reviewed | Independently assured | Incomplete | Stale. Measurement status and assurance status are different dimensions. Household/student figures are aggregated to prevent re-identification.
Documents & downloads
Every downloadable document carries an owner, classification, revision, publication date and accessible summary; private project documents are excluded from public search, caches and AI retrieval (D-04, [BB p. 25]). No documents are approved for publication yet — download entries are <PLACEHOLDER>.
Document lifecycle: draft → specialist review → legal/claims review → approval → published current version → superseded archive or restricted withdrawal; a report used in an investment decision is never silently overwritten ([BB p. 25]). Construction progress needs a defined basis, certifier and reporting date; a drone image is visual evidence of a date and location, not proof of completion ([BB p. 25]).